# Shemar Electric

Type: Company

Source: Climate Intelligence Brief — https://getclimatebrief.com/entity/shemar-electric
Canonical HTML page: https://getclimatebrief.com/entity/shemar-electric

## Timeline

- **2026-09-21**: Charlotte relocation announced — Shemar Electric USA announces $15 million investment in a 94,640-square-foot North Charlotte facility, creating 80 jobs and first U.S. production site.
- **2026-09**: Hiring begins — Shemar Electric USA starts hiring for engineering, maintenance, supply chain, warehousing, technical support, and business support roles later in September 2026.
- **2026**: Memphis headquarters closed — Shemar Electric USA shuts down its Memphis, Tennessee headquarters earlier in 2026 as part of the relocation to Charlotte.
- **1996**: Shemar Electric launched — Shemar Electric is founded, later establishing Shemar Electric USA as its North American branch.

## Recent coverage (1 stories)

### Charlotte Gets $15M Grid-Hardware Plant, 80 Jobs to Harden U.S. Power Grid
2026-09-25 12:53:11 · Sentiment: Neutral · Impact: 5/10 · Sources: 2

Shemar Electric USA's first American factory in Charlotte will produce composite insulators and grid-protection equipment domestically, supporting U.S. grid modernization, resilience, and renewable energy integration with a $15 million investment and 80 jobs.
Full story: https://getclimatebrief.com/story/shemar-electric-charlotte-grid-hardware-climate-energy

---
This page is a machine-readable summary. Sentiment measures the directional read of each development for this entity, not the tone of the reporting; impact weights consequence, not syndication reach. See https://getclimatebrief.com/guides/methodology for the full editorial methodology.