# Hydro-Québec

Type: Company

Source: Climate Intelligence Brief — https://getclimatebrief.com/entity/hydro-qubec
Canonical HTML page: https://getclimatebrief.com/entity/hydro-qubec

## Timeline

- **2035-01-01**: Grid Decarbonization Target — Target date for all Canadian provinces to achieve a net-zero electricity system.
- **2026-03-17**: 2026 Generation Outlook — CER projects a massive surge in wind power as the primary driver of new supply.
- **2025-12-15**: Clean Electricity Regulations Finalized — Federal government sets the framework for a net-zero grid by 2035.
- **2023-06-20**: First Net-Zero Modeling — CER releases its first long-term energy outlook aligned with a net-zero 2050 goal.

## Recent coverage (1 stories)

### Canada’s Grid to Double by 2050 as Wind Power Leads Generation Surge
2026-03-17 21:14:20 · Sentiment: Bullish · Impact: 7/10 · Sources: 2

The Canada Energy Regulator (CER) projects a massive expansion of national power generation, with wind energy emerging as a primary driver of the transition to net-zero. This surge reflects a fundamental shift in the Canadian energy landscape as electrification and decarbonization mandates reshape provincial grids.
Full story: https://getclimatebrief.com/story/canada-energy-regulator-wind-power-surge-2026

---
This page is a machine-readable summary. Sentiment measures the directional read of each development for this entity, not the tone of the reporting; impact weights consequence, not syndication reach. See https://getclimatebrief.com/guides/methodology for the full editorial methodology.